Milestones



 

2016

In January 2016, our Group obtained the approval for consolidated trial operation of Lasu Coal Mine for 450,000 tonnes.

2015

In December 2015, our Group obtained the approval for consolidated trial operation of Weishe Coal Mine and Luozhou Coal Mine for 450,000 tonnes.

2014

In July 2014, our Group obtained the approval to increase the designed annual production capacity of Weishe Coal Mine, Lasu Coal Mine and Luozhou Coal Mine to 450,000 tonnes respectively.

2014   In May 2014, we and Southern Power Grid cooperated to establish Nanneng Clean Energy, a joint venture engaged in the development and operation of CBM fired power generation projects.

2014   In March 2014, our Group qualified as one of the 100 coal mine consolidators in Guizhou Province.

2014   In March 2014, our Lasu Coal Mine commenced initial commercial production with the designed annual production capacity of 300,000 tonnes.

2014   In February 2014, Guizhou Union acquired Tiziyan Coal Mine and took over their assets and operating control on 28 February 2014.

2013

In February 2013, our Luozhou Coal Mine commenced initial commercial production with the designed annual production capacity of 150,000 tonnes.

2012

In October 2012, our Weishe Coal Mine commenced initial commercial production with the designed annual production capacity of 150,000 tonnes.

2011

In June 2011, Guizhou Union entered into the agreements to acquire Weishe Coal Mine, Lasu Coal Mine and Luozhou Coal Mine. Guizhou Union took over their assets and operating control on 30 June 2011.

2011

In June 2011, Guizhou Union was established.